Verification of XiTRACK Reinforcement over Weak Alluvial Soils at Deep Wharf Level Crossing, Purfltt

Peter Keith Woodward, G N Nicholl, R Thompson, R Smith

    Research output: Contribution to conferencePaperpeer-review

    Original languageEnglish
    Publication statusPublished - Jun 2005
    EventProceedings of the 8th International Conference 'Maintenance & Renewal of Permanent Way; Power & Signalling; Structures & Earthworks' - University of Westminster, London
    Duration: 29 Jun 200530 Jun 2005

    Conference

    ConferenceProceedings of the 8th International Conference 'Maintenance & Renewal of Permanent Way; Power & Signalling; Structures & Earthworks'
    CityLondon
    Period29/06/0530/06/05

    Cite this