Validation of the TSP Results with the TBM Parameters in Zagros Long Tunnel

N. Amini, S. Izadian, H. Mohammadigheymasi, A. Aborazzagh, A. Ebrahimi

Research output: Contribution to conferencePaperpeer-review

Abstract

The Tunnel Seismic Prediction (TSP) method was used to study geological hazards ahead in Zagros long tunnel. In this study, we present elastic moduli predicted by the TSP method in six consecutive TSP campaigns and validate predictions by measured TBM parameters. According to the results, TSP predicted two fractured zones with low elastic moduli values where TBM parameters including torque and thrust drop and penetration rate rise significantly. The strong correlation between TSP predictions and TBM parameters verifies the reliability of TSP results in this project.
Original languageEnglish
Pages1-5
Number of pages5
DOIs
Publication statusPublished - 3 Sept 2023
Event3rd Conference on Geophysics for Infrastructure Planning, Monitoring and BIM 2023 - Edinburgh, United Kingdom
Duration: 3 Sept 20237 Sept 2023

Conference

Conference3rd Conference on Geophysics for Infrastructure Planning, Monitoring and BIM 2023
Abbreviated titleNSG2023
Country/TerritoryUnited Kingdom
CityEdinburgh
Period3/09/237/09/23

Fingerprint

Dive into the research topics of 'Validation of the TSP Results with the TBM Parameters in Zagros Long Tunnel'. Together they form a unique fingerprint.

Cite this