User survey: the benefits of an online collaborative contract change management system

Ming Sun, Tejas Oza

    Research output: Contribution to journalArticle

    Abstract

    The Contract Change Management (CCM) system is an on-line collaboration tool, which supports the contract change management process of NEC (New Engineering Contract) form of contract. It is currently used in practice on a wide range of live civil, power and building projects in the UK. Anecdotal evidences show that the system helps construction projects in saving costs, reducing risk and increasing predictability. The aim of this study is to ascertain these benefits through first-hand feedback from its users. Key questions are: Does CCM help the contract change management process of NEC projects? What are its main benefits? Is there any difference between the views of different types of users, such as clients, contractors, or consultants? To achieve this aim, a questionnaire survey was conducted amongst 260 CCM users with a response rate of 33%, or 85 valid replies. The results have shown that most users are very positive and consistent in their responses. Process supports, such as audit trail and communication records, received the highest positive replies. Answers to benefits related to cost saving and business improvement are more mixed. Amongst the different user groups, clients and consultants are more positive towards the system than contractors.
    Original languageEnglish
    Pages (from-to)258-268
    Number of pages11
    JournalJournal of Information Technology in Construction
    Volume15
    Publication statusPublished - 2010

    Fingerprint

    Contractors
    Costs
    Feedback
    Communication
    Industry

    Keywords

    • IT benefits, Collaboration tools, User survey, Questionnaire, Change management

    Cite this

    @article{0d2d09fac1d94ffea5bcf2bbb55e3ede,
    title = "User survey: the benefits of an online collaborative contract change management system",
    abstract = "The Contract Change Management (CCM) system is an on-line collaboration tool, which supports the contract change management process of NEC (New Engineering Contract) form of contract. It is currently used in practice on a wide range of live civil, power and building projects in the UK. Anecdotal evidences show that the system helps construction projects in saving costs, reducing risk and increasing predictability. The aim of this study is to ascertain these benefits through first-hand feedback from its users. Key questions are: Does CCM help the contract change management process of NEC projects? What are its main benefits? Is there any difference between the views of different types of users, such as clients, contractors, or consultants? To achieve this aim, a questionnaire survey was conducted amongst 260 CCM users with a response rate of 33{\%}, or 85 valid replies. The results have shown that most users are very positive and consistent in their responses. Process supports, such as audit trail and communication records, received the highest positive replies. Answers to benefits related to cost saving and business improvement are more mixed. Amongst the different user groups, clients and consultants are more positive towards the system than contractors.",
    keywords = "IT benefits, Collaboration tools, User survey, Questionnaire, Change management",
    author = "Ming Sun and Tejas Oza",
    year = "2010",
    language = "English",
    volume = "15",
    pages = "258--268",
    journal = "Journal of Information Technology in Construction",
    issn = "1874-4753",

    }

    User survey: the benefits of an online collaborative contract change management system. / Sun, Ming; Oza, Tejas.

    In: Journal of Information Technology in Construction , Vol. 15, 2010, p. 258-268.

    Research output: Contribution to journalArticle

    TY - JOUR

    T1 - User survey: the benefits of an online collaborative contract change management system

    AU - Sun, Ming

    AU - Oza, Tejas

    PY - 2010

    Y1 - 2010

    N2 - The Contract Change Management (CCM) system is an on-line collaboration tool, which supports the contract change management process of NEC (New Engineering Contract) form of contract. It is currently used in practice on a wide range of live civil, power and building projects in the UK. Anecdotal evidences show that the system helps construction projects in saving costs, reducing risk and increasing predictability. The aim of this study is to ascertain these benefits through first-hand feedback from its users. Key questions are: Does CCM help the contract change management process of NEC projects? What are its main benefits? Is there any difference between the views of different types of users, such as clients, contractors, or consultants? To achieve this aim, a questionnaire survey was conducted amongst 260 CCM users with a response rate of 33%, or 85 valid replies. The results have shown that most users are very positive and consistent in their responses. Process supports, such as audit trail and communication records, received the highest positive replies. Answers to benefits related to cost saving and business improvement are more mixed. Amongst the different user groups, clients and consultants are more positive towards the system than contractors.

    AB - The Contract Change Management (CCM) system is an on-line collaboration tool, which supports the contract change management process of NEC (New Engineering Contract) form of contract. It is currently used in practice on a wide range of live civil, power and building projects in the UK. Anecdotal evidences show that the system helps construction projects in saving costs, reducing risk and increasing predictability. The aim of this study is to ascertain these benefits through first-hand feedback from its users. Key questions are: Does CCM help the contract change management process of NEC projects? What are its main benefits? Is there any difference between the views of different types of users, such as clients, contractors, or consultants? To achieve this aim, a questionnaire survey was conducted amongst 260 CCM users with a response rate of 33%, or 85 valid replies. The results have shown that most users are very positive and consistent in their responses. Process supports, such as audit trail and communication records, received the highest positive replies. Answers to benefits related to cost saving and business improvement are more mixed. Amongst the different user groups, clients and consultants are more positive towards the system than contractors.

    KW - IT benefits, Collaboration tools, User survey, Questionnaire, Change management

    M3 - Article

    VL - 15

    SP - 258

    EP - 268

    JO - Journal of Information Technology in Construction

    JF - Journal of Information Technology in Construction

    SN - 1874-4753

    ER -