Skip to main navigation Skip to search Skip to main content

The effect of different railway sleeper types on hanging sleeper development

Research output: Contribution to journal › Article › peer-review

28 Downloads (Pure)

Abstract

Hanging sleepers represent a significant challenge in railway infrastructure, particularly in transition zones where differential settlement creates gaps between sleepers and ballast, leading to accelerated track degradation and increased maintenance costs. This research investigates the occurrence and development of hanging sleepers through large-scale laboratory experiments conducted under controlled conditions representing real-world environments. Four sleepers are evaluated: 1) a conventional monoblock concrete sleeper, 2) a standard rectangular polymer sleeper, 3) a novel polymeric sleeper with a wedge-shaped base, 4) a novel polymeric self-levelling sleeper with a horizontal wedge mechanism. A full-scale accelerated lab testing approach is then used to simulate years of train loading within a short duration, thus allowing the collection of data on elastic and plastic deformations, stress levels beneath the ballast, and reaction forces under cyclic loading. Displacement-controlled testing was employed to simulate hanging sleeper conditions through repeated cyclic loading. Key findings reveal that polymeric sleeper develops the smallest gap after long-term cyclic testing, maintaining improved ballast contact under repeated loading. In terms of the reaction forces, the concrete sleeper exhibited the greatest reduction in reaction force (57%), followed by the wedge sleeper (52%), whilst the polymeric sleeper (47%) and the SLS-HW (35%) retained a greater share of their initial load-carrying capacity. Regarding the long-term settlement, the polymeric sleeper is estimated to reach the critical 2 mm settlement threshold after approximately 5,500,000 cycles, whilst the wedge sleeper reaches this 2.4 times earlier, and the concrete sleeper 1.6 times earlier. For the SLS-HW, the 2 mm threshold is reached 1.8 times earlier than the polymeric sleeper, at which point its self-levelling mechanism is activated, potentially postponing the need for maintenance.
Original languageEnglish
Article number102151
JournalTransportation Geotechnics
Volume62
Early online date1 Jun 2026
DOIs
Publication statusPublished - Jul 2026

Keywords

  • Hanging Sleepers
  • Railway Transition Zone
  • Polymeric Sleepers
  • Voiding
  • Large Scale Testing
  • Cyclic Loading

Fingerprint

Dive into the research topics of 'The effect of different railway sleeper types on hanging sleeper development'. Together they form a unique fingerprint.

Cite this