Teambuild: Training for collaboration - Human failures and success in a technical industry: Session 18, Paper 4

Research output: Contribution to conferencePaper

Abstract

It is essential to consider all elements of building services in the context of the building as new build, refurbishment or repair and maintenance. The paper describes the building procurement process and the way in which building services fit in. The Teambuild competition and the team build process of training young professionals is described, offered across the whole industry to graduates and to university students. The vital need for each part to appreciate and to fit into all other parts of the building procurement industry is defined. Teaching methods based on technology and context are proposed. In particular the way in which young engineers are prepared for qualification in their own and sister disciplines is reviewed.
Original languageEnglish
Publication statusPublished - 3 Apr 2014
EventCIBSE ASHRAE Technical Symposium 2014 - Dublin, Ireland
Duration: 3 Apr 20144 Apr 2014

Conference

ConferenceCIBSE ASHRAE Technical Symposium 2014
CountryIreland
CityDublin
Period3/04/144/04/14

Fingerprint

building
industry
teaching method
qualification
engineer
Industry
Teaching
Repair
graduate
Students
Engineers
university
student

Keywords

  • Collaboration
  • Construction
  • Training
  • Education
  • Professional accreditation

ASJC Scopus subject areas

  • Civil and Structural Engineering
  • Mechanical Engineering
  • Architecture
  • Building and Construction
  • Education

Cite this

Rooley, R. H., & MacLaren, A. J. W. (2014). Teambuild: Training for collaboration - Human failures and success in a technical industry: Session 18, Paper 4. Paper presented at CIBSE ASHRAE Technical Symposium 2014, Dublin, Ireland.
Rooley, Richard H. ; MacLaren, Alexandra Jane Wyatt. / Teambuild: Training for collaboration - Human failures and success in a technical industry : Session 18, Paper 4. Paper presented at CIBSE ASHRAE Technical Symposium 2014, Dublin, Ireland.
@conference{0be330faa74241d2b79af4acb6df5370,
title = "Teambuild: Training for collaboration - Human failures and success in a technical industry: Session 18, Paper 4",
abstract = "It is essential to consider all elements of building services in the context of the building as new build, refurbishment or repair and maintenance. The paper describes the building procurement process and the way in which building services fit in. The Teambuild competition and the team build process of training young professionals is described, offered across the whole industry to graduates and to university students. The vital need for each part to appreciate and to fit into all other parts of the building procurement industry is defined. Teaching methods based on technology and context are proposed. In particular the way in which young engineers are prepared for qualification in their own and sister disciplines is reviewed.",
keywords = "Collaboration, Construction, Training, Education, Professional accreditation",
author = "Rooley, {Richard H.} and MacLaren, {Alexandra Jane Wyatt}",
year = "2014",
month = "4",
day = "3",
language = "English",
note = "CIBSE ASHRAE Technical Symposium 2014 ; Conference date: 03-04-2014 Through 04-04-2014",

}

Rooley, RH & MacLaren, AJW 2014, 'Teambuild: Training for collaboration - Human failures and success in a technical industry: Session 18, Paper 4', Paper presented at CIBSE ASHRAE Technical Symposium 2014, Dublin, Ireland, 3/04/14 - 4/04/14.

Teambuild: Training for collaboration - Human failures and success in a technical industry : Session 18, Paper 4. / Rooley, Richard H.; MacLaren, Alexandra Jane Wyatt.

2014. Paper presented at CIBSE ASHRAE Technical Symposium 2014, Dublin, Ireland.

Research output: Contribution to conferencePaper

TY - CONF

T1 - Teambuild: Training for collaboration - Human failures and success in a technical industry

T2 - Session 18, Paper 4

AU - Rooley, Richard H.

AU - MacLaren, Alexandra Jane Wyatt

PY - 2014/4/3

Y1 - 2014/4/3

N2 - It is essential to consider all elements of building services in the context of the building as new build, refurbishment or repair and maintenance. The paper describes the building procurement process and the way in which building services fit in. The Teambuild competition and the team build process of training young professionals is described, offered across the whole industry to graduates and to university students. The vital need for each part to appreciate and to fit into all other parts of the building procurement industry is defined. Teaching methods based on technology and context are proposed. In particular the way in which young engineers are prepared for qualification in their own and sister disciplines is reviewed.

AB - It is essential to consider all elements of building services in the context of the building as new build, refurbishment or repair and maintenance. The paper describes the building procurement process and the way in which building services fit in. The Teambuild competition and the team build process of training young professionals is described, offered across the whole industry to graduates and to university students. The vital need for each part to appreciate and to fit into all other parts of the building procurement industry is defined. Teaching methods based on technology and context are proposed. In particular the way in which young engineers are prepared for qualification in their own and sister disciplines is reviewed.

KW - Collaboration

KW - Construction

KW - Training

KW - Education

KW - Professional accreditation

M3 - Paper

ER -

Rooley RH, MacLaren AJW. Teambuild: Training for collaboration - Human failures and success in a technical industry: Session 18, Paper 4. 2014. Paper presented at CIBSE ASHRAE Technical Symposium 2014, Dublin, Ireland.