T1 - Safety with access scaffolds
T2 - Development of a prototype decision aid based on accident analysis
AU - Whitaker, Sean M.
AU - Graves, Rod J.
AU - James, Malcom
AU - McCann, Paul
PY - 2003/8
Y1 - 2003/8
N2 - Problem: Accidents involving temporary access systems, particularly temporary scaffolds, account for a large proportion of injuries in the construction industry worldwide. Method: This paper outlines the development of a prototype decision aid (SCAFPASS, an abbreviation for Scaffold Planning Aid for System Safety) to promote access scaffold safety. It was guided by an examination of the root-causes and management deficiencies apparent in: (a) paper-based files of 186 access-related incidents held by the Health and Safety Executive (HSE) in the UK; and (b) computer-based files of 2,910 incidents appearing in the HSE database between 1997 to 2000. Results: The more frequent root-causes included the fitting of defective components, unauthorized modification of the structure, omission of barriers, and errors resulting in simple, readily detectable structural faults. Common managerial deficiencies included failure to control risk, unsafe methods and procedures, and inadequate training and supervision. Impact on Industry: SCAFPASS aims to avoid these root-causes by improving safety management from the outset and throughout all phases of a project. © 2003 National Safety Council and Elsevier Science Ltd. All rights reserved.
AB - Problem: Accidents involving temporary access systems, particularly temporary scaffolds, account for a large proportion of injuries in the construction industry worldwide. Method: This paper outlines the development of a prototype decision aid (SCAFPASS, an abbreviation for Scaffold Planning Aid for System Safety) to promote access scaffold safety. It was guided by an examination of the root-causes and management deficiencies apparent in: (a) paper-based files of 186 access-related incidents held by the Health and Safety Executive (HSE) in the UK; and (b) computer-based files of 2,910 incidents appearing in the HSE database between 1997 to 2000. Results: The more frequent root-causes included the fitting of defective components, unauthorized modification of the structure, omission of barriers, and errors resulting in simple, readily detectable structural faults. Common managerial deficiencies included failure to control risk, unsafe methods and procedures, and inadequate training and supervision. Impact on Industry: SCAFPASS aims to avoid these root-causes by improving safety management from the outset and throughout all phases of a project. © 2003 National Safety Council and Elsevier Science Ltd. All rights reserved.
KW - Access scaffold
KW - Accident analysis
KW - Decision support
KW - Root causes
KW - Safety
UR - http://www.scopus.com/inward/record.url?scp=0043194336&partnerID=8YFLogxK
U2 - 10.1016/S0022-4375(03)00025-2
DO - 10.1016/S0022-4375(03)00025-2
M3 - Literature review
VL - 34
SP - 249
EP - 261
JO - Journal of Safety Research
JF - Journal of Safety Research
IS - 3
ER -