Abstract
Construction delays are common in construction industry and create major concerns for project performance. Construction delays are caused by many factors. The aim of this paper is to identify delay factors on construction projects and analyze these factors with the relative importance index method. For this purpose, 83 different delay factors were identified, categorized into nine major groups, and visualized by the Ishikawa (fishbone) diagram through detailed literature review and interviews with experts from the construction industry. The relative importances of these delay factors were quantified by the relative importance index method. The ranking of the factors and groups were demonstrated according to their importance level on delay. According to the case study results, the factors and groups contributing the most to delays (those needing attention) were discussed, and some recommendations were made to minimize and control delays in construction projects.
| Original language | English |
|---|---|
| Pages (from-to) | 133-139 |
| Number of pages | 7 |
| Journal | Journal of Management in Engineering |
| Volume | 29 |
| Issue number | 2 |
| DOIs | |
| Publication status | Published - Apr 2013 |
Keywords
- Construction projects
- Relative importance index method
- Schedule delay
ASJC Scopus subject areas
- Industrial relations
- General Engineering
- Strategy and Management
- Management Science and Operations Research
Fingerprint
Dive into the research topics of 'Quantification of delay factors using the relative importance index method for construction projects in Turkey'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver