Net-Zero Considerations within the Delivery of Major AEC Projects in the UK: A Thematic Analysis of the Key Challenges for Project Managers

Research output: Contribution to journalArticlepeer-review

5 Downloads (Pure)

Abstract

The growing emphasis on carbon considerations and the pursuit of net-zero emissions have brought about a paradigm shift in project management. To successfully facilitate the transition towards net-zero emissions, major projects must not only adapt existing systems but also embed carbon targets into their core strategies. While several studies have investigated carbon integration during the procurement phase, limited attention has been given to the construction project manager (PM) perspective. This study aims to bridge this research gap by exploring the challenges and barriers faced by construction PMs when integrating carbon targets and metrics into major Architectural, Engineering and Construction (AEC) projects, as well as evaluating the readiness of project teams to deliver on these. This study deployed a qualitative exploratory research design, where semi-structured interviews were conducted with 17 AEC project professionals actively engaged in the planning and execution of major projects in the UK. Thematic analysis of the data revealed a range of challenges and barriers faced by PM teams delivering these projects. The research findings contribute to the field of construction major projects and project management by enhancing the understanding of the challenges faced by PMs when planning and delivering major AEC projects within the context of the net-zero transition. This study uncovers a series of challenges and prevalent practices that have the potential to impede progress towards net zero. A conceptual model is also proposed, offering a synthesis of the different PM perspectives on carbon integration.
Original languageEnglish
Article number8453
JournalSustainability
Volume16
Issue number19
Early online date28 Sept 2024
DOIs
Publication statusPublished - 1 Oct 2024

Keywords

  • AEC
  • construction
  • major projects
  • mega projects
  • net-zero
  • carbon emissions
  • construction project management

Fingerprint

Dive into the research topics of 'Net-Zero Considerations within the Delivery of Major AEC Projects in the UK: A Thematic Analysis of the Key Challenges for Project Managers'. Together they form a unique fingerprint.

Cite this