Skip to main navigation Skip to search Skip to main content

Multiple-model seismic and production history matching: a case study

Research output: Contribution to journalArticlepeer-review

Abstract

Time-lapse (or 4D) seismic is increasingly being used as a qualitative description of reservoir behavior for management and decision-making purposes. When combined quantitatively with geological and flow modeling as part of history matching, improved predictions of reservoir production can be obtained. Here, we apply a method of multiple-model history matching based on simultaneous comparison of spatial data offered by seismic as well as individual well-production data. Using a petroelastic transform and suitable rescaling, forward-modeled simulations are converted into predictions of seismic impedance attributes and compared to observed data by calculation of a misfit. A similar approach is applied to dynamic well data. This approach improves on gradient-based methods by avoiding entrapment in local minima. We demonstrate the method by applying it to the UKCS Schiehallion reservoir, updating the operator's model. We consider a number of parameters to be uncertain. The reservoir's net to gross is initially updated to better match the observed baseline acoustic impedance derived from the RMS amplitudes of the migrated stack. We then history match simultaneously for permeability, fault transmissibil-ity multipliers, and the petroelastic transform parameters. Our results show a good match to the observed seismic and well data with significant improvement to the base case.
Original languageEnglish
Pages (from-to)418-430
Number of pages13
JournalSPE Journal
Volume11
Issue number4
DOIs
Publication statusPublished - Dec 2006

Fingerprint

Dive into the research topics of 'Multiple-model seismic and production history matching: a case study'. Together they form a unique fingerprint.

Cite this