Abstract
The design of the acid gas removal unit is of great importance to overcome and complete successfully a FLNG project. It is necessary to build up accurate knowledge of the impact of the movements on the towers operation, to first secure then to optimize the design of the processing units. Indeed both flooding and internals efficiency significantly impacts tower sizing and thus the whole FLNG project. Total, Prosemat, and IFP Energies nouvelles have conducted a 4-yr research and development program at Heriot-Watt University to model mass trasnfer and hydraulics of a tilting and moving tower. In order to better understand the impact of the column diameter on the results and to be able to scale-up the results, two different column sizes were used.The first phase of tests included static and pitch tests with varying periods and angles, at different liquid loads to map the distortion of liquid distribution at several heights of packing. A second test phase has been launched at the start of 2015 with a column installed on a hexapod. The machine will allow quanitfying the impact of accelerations and three-dimensional motions on the hydraulics and mass transfer of gas/liquid contacting tower.
Original language | English |
---|---|
Title of host publication | 95th Annual Convention of the Gas Processors Association 2016 |
Subtitle of host publication | Where Midstream Means Business |
Publisher | Gas Processors Association |
Pages | 414-431 |
Number of pages | 18 |
Volume | 2 |
ISBN (Electronic) | 9781510842861 |
Publication status | Published - 2016 |
Event | 95th Annual Convention of the Gas Processors Association 2016: Where Midstream Means Business - New Orleans, United States Duration: 10 Apr 2016 → 13 Apr 2016 |
Conference
Conference | 95th Annual Convention of the Gas Processors Association 2016: Where Midstream Means Business |
---|---|
Country/Territory | United States |
City | New Orleans |
Period | 10/04/16 → 13/04/16 |
ASJC Scopus subject areas
- Energy Engineering and Power Technology