Forensic delay analysis of a Revamp Power Transmission Project: A case study

Research output: Contribution to conferencePaperpeer-review

Abstract

Project delays are a common feature in the construction of industrial projects. Timely completion of these projects is significantly important for both clients and contractors, though for different reasons. Any delays beyond the stipulated project completion time usually result in substantial commercial losses and often cause litigation among project participants. Therefore, it is critical to understand and analyse major delay events in industrial projects using a method that may have legal acceptance in case of delayed claims and court proceedings. This paper presents a case study of a large-scale power transmission project involving the revamp of 36 substations across eight regions in Saudi Arabia. A forensic delay analysis was performed using a window analysis technique to identify the major causes of delays in the project. The analysis was conducted using a critical path method (CPM)-based simulation model under an Observational Dynamic Logic Contemporaneous framework. The study identified 11 major delay events contributing to delays and work prolongation for 581 calendar days from the baseline mechanical completion of the project. Key findings reveal that the primary contributors to project delays included land and work permit issues, delayed approvals of technical documents, change orders, and procurement challenges. This study draws on a real-world project and actual project data, comparing the contractual baseline schedule with as-built progress to analyse and present research findings. The results offer valuable insights for both academia and industry, enhancing the understanding of delays caused in industrial projects within the context of Saudi Arabia.
Original languageEnglish
Publication statusPublished - 10 Nov 2025
Event15th International Conference on Construction in the 21st Century 2025 - International University of Rabat, Rabat, Morocco
Duration: 10 Nov 202514 Nov 2025
Conference number: 15
https://www.citcglobal.com/

Conference

Conference15th International Conference on Construction in the 21st Century 2025
Abbreviated titleCITC-15
Country/TerritoryMorocco
CityRabat
Period10/11/2514/11/25
Internet address

Fingerprint

Dive into the research topics of 'Forensic delay analysis of a Revamp Power Transmission Project: A case study'. Together they form a unique fingerprint.

Cite this