Effectiveness of implementing Activity Based Costing technique on cost control function and performance of construction projects

Assem Al-Hajj, Taha Al Zaher

    Research output: Contribution to conferencePaper

    Original languageEnglish
    Publication statusPublished - 2012
    Event7th International Conference on Innovation in Architecture, Engineering & Construction - The Brazilian British Centre, São Paulo, Brazil
    Duration: 15 Aug 201217 Aug 2012

    Conference

    Conference7th International Conference on Innovation in Architecture, Engineering & Construction
    Abbreviated titleAEC 2012
    CountryBrazil
    CitySão Paulo
    Period15/08/1217/08/12

    Cite this

    Al-Hajj, A., & Al Zaher, T. (2012). Effectiveness of implementing Activity Based Costing technique on cost control function and performance of construction projects. Paper presented at 7th International Conference on Innovation in Architecture, Engineering & Construction, São Paulo, Brazil.
    Al-Hajj, Assem ; Al Zaher, Taha. / Effectiveness of implementing Activity Based Costing technique on cost control function and performance of construction projects. Paper presented at 7th International Conference on Innovation in Architecture, Engineering & Construction, São Paulo, Brazil.
    @conference{4989c1bfbe2d458cb67e42f01292da84,
    title = "Effectiveness of implementing Activity Based Costing technique on cost control function and performance of construction projects",
    author = "Assem Al-Hajj and {Al Zaher}, Taha",
    year = "2012",
    language = "English",
    note = "7th International Conference on Innovation in Architecture, Engineering & Construction, AEC 2012 ; Conference date: 15-08-2012 Through 17-08-2012",

    }

    Al-Hajj, A & Al Zaher, T 2012, 'Effectiveness of implementing Activity Based Costing technique on cost control function and performance of construction projects', Paper presented at 7th International Conference on Innovation in Architecture, Engineering & Construction, São Paulo, Brazil, 15/08/12 - 17/08/12.

    Effectiveness of implementing Activity Based Costing technique on cost control function and performance of construction projects. / Al-Hajj, Assem; Al Zaher, Taha.

    2012. Paper presented at 7th International Conference on Innovation in Architecture, Engineering & Construction, São Paulo, Brazil.

    Research output: Contribution to conferencePaper

    TY - CONF

    T1 - Effectiveness of implementing Activity Based Costing technique on cost control function and performance of construction projects

    AU - Al-Hajj, Assem

    AU - Al Zaher, Taha

    PY - 2012

    Y1 - 2012

    M3 - Paper

    ER -

    Al-Hajj A, Al Zaher T. Effectiveness of implementing Activity Based Costing technique on cost control function and performance of construction projects. 2012. Paper presented at 7th International Conference on Innovation in Architecture, Engineering & Construction, São Paulo, Brazil.