Abstract
A substitution box (S-box) plays a crucial role in symmetric key cryptography with block ciphers, such as those found in the Data Encryption Standard (DES) and the Advanced Encryption Standard (AES). It serves as the predominant component in most block ciphers, of which the computational complexity impacts the security of the ciphers directly. In essence, a S-box performs a non-linear transformation of the input data block through a finite field inversion, which is incidentally the most expensive operation in digital computation of finite field arithmetic. Consequently, its computational cost will also increase the overall hardware requirements and in turn, decrease the overall performance of the ciphers. With the emergence of Internet of Things (IoT), the need for highly secured yet lightweight implementation protocols is becoming increasingly more observable. In this paper, we propose a new finite field inverter over GF(28) with a significant area cost saving, achieved through direct computation and followed by algebraic factorization and common sub-expression elimination (CSE). The proposed inverter could be deployed into AES cipher on highly area-constrained digital platforms.
| Original language | English |
|---|---|
| Title of host publication | 2015 IEEE International Conference on Digital Signal Processing, DSP 2015 |
| Publisher | IEEE |
| Pages | 775-779 |
| Number of pages | 5 |
| ISBN (Electronic) | 9781479980581 |
| DOIs | |
| Publication status | Published - Sept 2015 |
| Event | 2015 IEEE International Conference on Digital Signal Processing - Singapore, Singapore Duration: 21 Jul 2015 → 24 Jul 2015 |
Conference
| Conference | 2015 IEEE International Conference on Digital Signal Processing |
|---|---|
| Abbreviated title | DSP 2015 |
| Country/Territory | Singapore |
| City | Singapore |
| Period | 21/07/15 → 24/07/15 |
Keywords
- Algebraic Factorization
- Common Sub-expression Elimination (CSE)
- Finite field inversion
- Low complexity
- S-box
ASJC Scopus subject areas
- Signal Processing
Fingerprint
Dive into the research topics of 'Compact and short critical path finite field inverter for cryptographic S-box'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver