Abstract
An updating strategy is designed to iteratively close the loop (CtL) between the fluid flow simulation predictions and measured production history, predicted and observed 4D seismic data, and finally predicted and inverted impedance/impedance changes. The central ingredient in this scheme is the computation of elastic property changes that are inverted from the seismic in an engineering-consistent (EC) manner. The geometry, volumetrics and transmissibility multipliers for the reservoir model are updated in three successive stages by sequential comparison between the seismic and fluid flow domains. The EC-CtL workflow is implemented on a West African field, where reservoir model improvements are obtained in combination with a consistency between model, impedance and seismic domains.
Original language | English |
---|---|
Pages | 1-5 |
Number of pages | 5 |
DOIs | |
Publication status | Published - 17 Nov 2013 |
Event | EAGE/SPE Joint Workshop - Beyond Closed Loop Intergrated Monitoring - Lisbon, Portugal Duration: 17 Nov 2013 → 20 Nov 2013 |
Conference
Conference | EAGE/SPE Joint Workshop - Beyond Closed Loop Intergrated Monitoring |
---|---|
Country/Territory | Portugal |
City | Lisbon |
Period | 17/11/13 → 20/11/13 |