An Integrated Framework for Refinery Scheduling and Operational Optimization

Khairiyah M. Siraj, Nooryusmiza Yusoff, Mahadzir Shuhaimi, Syed Faizan Ali

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

This work deals with an integrated decision at the refinery scheduling and operational optimization levels. Re-scheduling is performed as a means to integrate both of these levels. Results indicate that the total benefit obtained by the proposed integrated method managed to increase 16% of the base case profit.

Original languageEnglish
Title of host publicationProcess and Advanced Materials Engineering
EditorsIqbal Ahmed
PublisherTrans Tech Publications
Pages390-393
Number of pages4
ISBN (Electronic)9783038265641
ISBN (Print)9783038351818
DOIs
Publication statusPublished - Sep 2014
Event3rd International Conference on Process Engineering and Advanced Materials 2014 - Kuala Lumpur, Malaysia
Duration: 3 Jun 20145 Jun 2014

Publication series

NameApplied Mechanics and Materials
PublisherTrans Tech Publications
Volume625
ISSN (Print)1660-9336
ISSN (Electronic)1662-7482

Conference

Conference3rd International Conference on Process Engineering and Advanced Materials 2014
Abbreviated titleICPEAM 2014
CountryMalaysia
CityKuala Lumpur
Period3/06/145/06/14

Fingerprint

Scheduling
Profitability

Keywords

  • Hierarchical integration
  • Operational optimization
  • Scheduling

ASJC Scopus subject areas

  • Engineering(all)

Cite this

Siraj, K. M., Yusoff, N., Shuhaimi, M., & Ali, S. F. (2014). An Integrated Framework for Refinery Scheduling and Operational Optimization. In I. Ahmed (Ed.), Process and Advanced Materials Engineering (pp. 390-393). (Applied Mechanics and Materials; Vol. 625). Trans Tech Publications. https://doi.org/10.4028/www.scientific.net/AMM.625.390
Siraj, Khairiyah M. ; Yusoff, Nooryusmiza ; Shuhaimi, Mahadzir ; Ali, Syed Faizan. / An Integrated Framework for Refinery Scheduling and Operational Optimization. Process and Advanced Materials Engineering. editor / Iqbal Ahmed. Trans Tech Publications, 2014. pp. 390-393 (Applied Mechanics and Materials).
@inproceedings{3ef15641e53b4e26af83eaa4fef96afb,
title = "An Integrated Framework for Refinery Scheduling and Operational Optimization",
abstract = "This work deals with an integrated decision at the refinery scheduling and operational optimization levels. Re-scheduling is performed as a means to integrate both of these levels. Results indicate that the total benefit obtained by the proposed integrated method managed to increase 16{\%} of the base case profit.",
keywords = "Hierarchical integration, Operational optimization, Scheduling",
author = "Siraj, {Khairiyah M.} and Nooryusmiza Yusoff and Mahadzir Shuhaimi and Ali, {Syed Faizan}",
year = "2014",
month = "9",
doi = "10.4028/www.scientific.net/AMM.625.390",
language = "English",
isbn = "9783038351818",
series = "Applied Mechanics and Materials",
publisher = "Trans Tech Publications",
pages = "390--393",
editor = "Iqbal Ahmed",
booktitle = "Process and Advanced Materials Engineering",
address = "Germany",

}

Siraj, KM, Yusoff, N, Shuhaimi, M & Ali, SF 2014, An Integrated Framework for Refinery Scheduling and Operational Optimization. in I Ahmed (ed.), Process and Advanced Materials Engineering. Applied Mechanics and Materials, vol. 625, Trans Tech Publications, pp. 390-393, 3rd International Conference on Process Engineering and Advanced Materials 2014, Kuala Lumpur, Malaysia, 3/06/14. https://doi.org/10.4028/www.scientific.net/AMM.625.390

An Integrated Framework for Refinery Scheduling and Operational Optimization. / Siraj, Khairiyah M.; Yusoff, Nooryusmiza; Shuhaimi, Mahadzir; Ali, Syed Faizan.

Process and Advanced Materials Engineering. ed. / Iqbal Ahmed. Trans Tech Publications, 2014. p. 390-393 (Applied Mechanics and Materials; Vol. 625).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - An Integrated Framework for Refinery Scheduling and Operational Optimization

AU - Siraj, Khairiyah M.

AU - Yusoff, Nooryusmiza

AU - Shuhaimi, Mahadzir

AU - Ali, Syed Faizan

PY - 2014/9

Y1 - 2014/9

N2 - This work deals with an integrated decision at the refinery scheduling and operational optimization levels. Re-scheduling is performed as a means to integrate both of these levels. Results indicate that the total benefit obtained by the proposed integrated method managed to increase 16% of the base case profit.

AB - This work deals with an integrated decision at the refinery scheduling and operational optimization levels. Re-scheduling is performed as a means to integrate both of these levels. Results indicate that the total benefit obtained by the proposed integrated method managed to increase 16% of the base case profit.

KW - Hierarchical integration

KW - Operational optimization

KW - Scheduling

UR - http://www.scopus.com/inward/record.url?scp=84914171114&partnerID=8YFLogxK

U2 - 10.4028/www.scientific.net/AMM.625.390

DO - 10.4028/www.scientific.net/AMM.625.390

M3 - Conference contribution

SN - 9783038351818

T3 - Applied Mechanics and Materials

SP - 390

EP - 393

BT - Process and Advanced Materials Engineering

A2 - Ahmed, Iqbal

PB - Trans Tech Publications

ER -

Siraj KM, Yusoff N, Shuhaimi M, Ali SF. An Integrated Framework for Refinery Scheduling and Operational Optimization. In Ahmed I, editor, Process and Advanced Materials Engineering. Trans Tech Publications. 2014. p. 390-393. (Applied Mechanics and Materials). https://doi.org/10.4028/www.scientific.net/AMM.625.390