A study into the reasons for process improvement project failures

results from a pilot survey

Jiju Antony, Fabiane Letícia Lizarelli, Marcelo Machado Fernandes, Mary Dempsey, Attracta Brennan, Julie McFarlane

Research output: Contribution to journalArticle

Abstract

Purpose: Process improvement initiatives, such as Lean, Six Sigma and Lean Six Sigma, typically have common characteristics that are carried through projects. Whilst a project’s performance is an important determinant of the successful implementation of continuous improvement (CI) initiatives, its failure can undermine the impact of any CI initiative on business performance. As a result, an understanding of the reasons of process improvement project failures is crucial. The purpose of this paper is to present the results of a pilot survey highlighting the most common reasons for process improvement project failures.

Design/methodology/approach: This paper presents a pilot survey of 42 Brazilian manufacturing specialists who have been involved in process improvement projects. The participants of this survey were Six Sigma Master Black Belts, Black Belts, Green Belts and Six Sigma champions from manufacturing companies in Brazil. The survey questionnaire was piloted with five experts in the field in order to ensure that the questions were valid and technically sound.

Findings: The execution of Six Sigma projects in organizations results in a moderate rate of project failures. These failures can cost organizations several millions of dollars especially within the context of larger organizations. The main reasons for project failure, as cited by the specialists include: resistance to change, lack of commitment and support from top management and incompetent teams.

Research limitations/implications: The authors report the findings from a pilot survey having a limited sample size. Moreover, the data have been collected from one country and primarily from large manufacturing companies.

Originality/value: To the best of the authors’ knowledge, this is the first empirical study looking into the reasons for process improvement project failures. The authors argue that if the top reasons for such failures are understood, a framework can be developed in the future that can mitigate the chance of project failures during project execution. This could potentially lead to significant savings to the bottom-line of many organizations.

Original languageEnglish
Pages (from-to)1699-1720
Number of pages22
JournalInternational Journal of Quality and Reliability Management
Volume36
Issue number10
Early online date2 Jul 2019
DOIs
Publication statusPublished - 4 Nov 2019

Fingerprint

Project failure
Process improvement
Six Sigma
Manufacturing companies
Lean Six Sigma
Black belt
Continuous improvement
Project performance
Business performance
Costs
Empirical study
Brazil
Top management
Savings
Sample size
Questionnaire survey
Manufacturing
Resistance to change
Champions
Design methodology

Keywords

  • Continuous improvement projects
  • Process improvement
  • Project failures
  • Project management
  • Six Sigma project failures
  • Survey

ASJC Scopus subject areas

  • Business, Management and Accounting(all)
  • Strategy and Management

Cite this

Antony, Jiju ; Lizarelli, Fabiane Letícia ; Fernandes, Marcelo Machado ; Dempsey, Mary ; Brennan, Attracta ; McFarlane, Julie. / A study into the reasons for process improvement project failures : results from a pilot survey. In: International Journal of Quality and Reliability Management. 2019 ; Vol. 36, No. 10. pp. 1699-1720.
@article{bb3eb3383ca94cbbb9838acd0aa5a8e8,
title = "A study into the reasons for process improvement project failures: results from a pilot survey",
abstract = "Purpose: Process improvement initiatives, such as Lean, Six Sigma and Lean Six Sigma, typically have common characteristics that are carried through projects. Whilst a project’s performance is an important determinant of the successful implementation of continuous improvement (CI) initiatives, its failure can undermine the impact of any CI initiative on business performance. As a result, an understanding of the reasons of process improvement project failures is crucial. The purpose of this paper is to present the results of a pilot survey highlighting the most common reasons for process improvement project failures.Design/methodology/approach: This paper presents a pilot survey of 42 Brazilian manufacturing specialists who have been involved in process improvement projects. The participants of this survey were Six Sigma Master Black Belts, Black Belts, Green Belts and Six Sigma champions from manufacturing companies in Brazil. The survey questionnaire was piloted with five experts in the field in order to ensure that the questions were valid and technically sound.Findings: The execution of Six Sigma projects in organizations results in a moderate rate of project failures. These failures can cost organizations several millions of dollars especially within the context of larger organizations. The main reasons for project failure, as cited by the specialists include: resistance to change, lack of commitment and support from top management and incompetent teams.Research limitations/implications: The authors report the findings from a pilot survey having a limited sample size. Moreover, the data have been collected from one country and primarily from large manufacturing companies.Originality/value: To the best of the authors’ knowledge, this is the first empirical study looking into the reasons for process improvement project failures. The authors argue that if the top reasons for such failures are understood, a framework can be developed in the future that can mitigate the chance of project failures during project execution. This could potentially lead to significant savings to the bottom-line of many organizations.",
keywords = "Continuous improvement projects, Process improvement, Project failures, Project management, Six Sigma project failures, Survey",
author = "Jiju Antony and Lizarelli, {Fabiane Let{\'i}cia} and Fernandes, {Marcelo Machado} and Mary Dempsey and Attracta Brennan and Julie McFarlane",
year = "2019",
month = "11",
day = "4",
doi = "10.1108/IJQRM-03-2019-0093",
language = "English",
volume = "36",
pages = "1699--1720",
journal = "International Journal of Quality and Reliability Management",
issn = "0265-671X",
publisher = "Emerald Publishing Limited",
number = "10",

}

A study into the reasons for process improvement project failures : results from a pilot survey. / Antony, Jiju; Lizarelli, Fabiane Letícia; Fernandes, Marcelo Machado; Dempsey, Mary; Brennan, Attracta; McFarlane, Julie.

In: International Journal of Quality and Reliability Management, Vol. 36, No. 10, 04.11.2019, p. 1699-1720.

Research output: Contribution to journalArticle

TY - JOUR

T1 - A study into the reasons for process improvement project failures

T2 - results from a pilot survey

AU - Antony, Jiju

AU - Lizarelli, Fabiane Letícia

AU - Fernandes, Marcelo Machado

AU - Dempsey, Mary

AU - Brennan, Attracta

AU - McFarlane, Julie

PY - 2019/11/4

Y1 - 2019/11/4

N2 - Purpose: Process improvement initiatives, such as Lean, Six Sigma and Lean Six Sigma, typically have common characteristics that are carried through projects. Whilst a project’s performance is an important determinant of the successful implementation of continuous improvement (CI) initiatives, its failure can undermine the impact of any CI initiative on business performance. As a result, an understanding of the reasons of process improvement project failures is crucial. The purpose of this paper is to present the results of a pilot survey highlighting the most common reasons for process improvement project failures.Design/methodology/approach: This paper presents a pilot survey of 42 Brazilian manufacturing specialists who have been involved in process improvement projects. The participants of this survey were Six Sigma Master Black Belts, Black Belts, Green Belts and Six Sigma champions from manufacturing companies in Brazil. The survey questionnaire was piloted with five experts in the field in order to ensure that the questions were valid and technically sound.Findings: The execution of Six Sigma projects in organizations results in a moderate rate of project failures. These failures can cost organizations several millions of dollars especially within the context of larger organizations. The main reasons for project failure, as cited by the specialists include: resistance to change, lack of commitment and support from top management and incompetent teams.Research limitations/implications: The authors report the findings from a pilot survey having a limited sample size. Moreover, the data have been collected from one country and primarily from large manufacturing companies.Originality/value: To the best of the authors’ knowledge, this is the first empirical study looking into the reasons for process improvement project failures. The authors argue that if the top reasons for such failures are understood, a framework can be developed in the future that can mitigate the chance of project failures during project execution. This could potentially lead to significant savings to the bottom-line of many organizations.

AB - Purpose: Process improvement initiatives, such as Lean, Six Sigma and Lean Six Sigma, typically have common characteristics that are carried through projects. Whilst a project’s performance is an important determinant of the successful implementation of continuous improvement (CI) initiatives, its failure can undermine the impact of any CI initiative on business performance. As a result, an understanding of the reasons of process improvement project failures is crucial. The purpose of this paper is to present the results of a pilot survey highlighting the most common reasons for process improvement project failures.Design/methodology/approach: This paper presents a pilot survey of 42 Brazilian manufacturing specialists who have been involved in process improvement projects. The participants of this survey were Six Sigma Master Black Belts, Black Belts, Green Belts and Six Sigma champions from manufacturing companies in Brazil. The survey questionnaire was piloted with five experts in the field in order to ensure that the questions were valid and technically sound.Findings: The execution of Six Sigma projects in organizations results in a moderate rate of project failures. These failures can cost organizations several millions of dollars especially within the context of larger organizations. The main reasons for project failure, as cited by the specialists include: resistance to change, lack of commitment and support from top management and incompetent teams.Research limitations/implications: The authors report the findings from a pilot survey having a limited sample size. Moreover, the data have been collected from one country and primarily from large manufacturing companies.Originality/value: To the best of the authors’ knowledge, this is the first empirical study looking into the reasons for process improvement project failures. The authors argue that if the top reasons for such failures are understood, a framework can be developed in the future that can mitigate the chance of project failures during project execution. This could potentially lead to significant savings to the bottom-line of many organizations.

KW - Continuous improvement projects

KW - Process improvement

KW - Project failures

KW - Project management

KW - Six Sigma project failures

KW - Survey

UR - http://www.scopus.com/inward/record.url?scp=85070333909&partnerID=8YFLogxK

U2 - 10.1108/IJQRM-03-2019-0093

DO - 10.1108/IJQRM-03-2019-0093

M3 - Article

VL - 36

SP - 1699

EP - 1720

JO - International Journal of Quality and Reliability Management

JF - International Journal of Quality and Reliability Management

SN - 0265-671X

IS - 10

ER -