A mathematical-based model for company-level budgeting incorporating future unknown contracts

Ammar P. Kaka, F. Khosrowshahi

    Research output: Contribution to journalArticlepeer-review

    2 Citations (Scopus)

    Abstract

    Purpose - One of the main challenges facing construction contractors is incorporating future unknown contracts into their annual financial budgets. This paper sets out to review current academic work in this area and to argue that computer-based simulation techniques are too complex to be adopted in the industry. Therefore, an alternative and a mathematically-based technique needs to be developed and evaluated. Design/methodology/approach - The paper proposes that, as the pattern of winning construction contracts lacks any seasonality, it may be possible to assume all future work to be starting at one point in time and, by using an average standard value build-up curve, average duration and the total value work needed, contractors will be able to estimate the total value of contracts needed to achieve a target turnover. Based on the total value of contracts to be won, a proposed mathematical equation is then used to assess the levels of working capital requirements. Findings - The paper evaluates the proposed mathematical model through a series of hypothetical scenarios (developed using a detailed and tested computer-based simulation model). Results demonstrated the validity and reliability of the models. Research limitations/implications - The working capital element of the proposed model applies to construction projects where traditional payment mechanisms have been applied (interim payments based on measurements). Practical implications - The model is very practical in nature and will allow construction companies (particularly large ones) to assess the level of work (in terms of number and values of contracts) they will need to win for them to meet targets for turnover. The model also allows contractors to assess the associated level of funding required. Originality/value - The mathematical model developed allows contractors to incorporate into their budgets future unknown contracts without the need for computer simulation. © Emerald Group Publishing Limited.

    Original languageEnglish
    Pages (from-to)48-60
    Number of pages13
    JournalEngineering Construction and Architectural Management
    Volume16
    Issue number1
    DOIs
    Publication statusPublished - 2009

    Keywords

    • Budgetary control
    • Cash flow
    • Simulation
    • Working capital

    Fingerprint

    Dive into the research topics of 'A mathematical-based model for company-level budgeting incorporating future unknown contracts'. Together they form a unique fingerprint.

    Cite this